top of page
Echo Park
The Echo Park residence extensive remodel included the basement, main floor and attic. In addition to designing and walking the project through the approval process, I guided the Owner/Builder from beginning to end securing both a general contractor and structural engineer.

Kitchen

Exterior
Exterior as-built and proposed remodel

First floor proposal
Revit proposal drawing

Kitchen
Click on image to open in a pop-up.
First floor walk through of proposed remodel.
First floor and attic walk through of
proposed remodel.
bottom of page





